Bold New Brock Home
Bold New Brock

Published on Brock University (http://www.brocku.ca)

Home > Printer-friendly > Printer-friendly

Atta Abad barrier lake drainage spillway - August 6th 2010

image/jpeg iconDSC_0052.JPG [1]
Atta Abad barrier lake drainage spillway flowing over landslide deposit.
image/jpeg iconDSC_0079.JPG [2]
Barrier lake drainage spillway - middle portion.
image/jpeg iconDSC_0087.JPG [3]
Barrier lake drainage spillway - upper portion.
image/jpeg iconDSC_0088.JPG [4]
Large boulders controlling flow of drainage spillway.
image/jpeg iconDSC_0090.JPG [5]
Large boulders controlling flow of drainage spillway.
image/jpeg iconDSC_0099.JPG [6]
Barrier lake drainage spillway - upper portion.
image/jpeg iconDSC_0106.JPG [7]
Landslide scar and remains of Atta Abad village.
image/jpeg iconDSC_0112.JPG [8]
Upper portion of barrier lake drainage spillway with barrier lake in distance.
image/jpeg iconDSC_0347.JPG [9]
Landslide deposit and lower portion of drainage spillway.
image/jpeg iconDSC_0354.JPG [10]
Lower portion of drainage spillway.
David Butz - Geography - Research
Source URL: http://www.brocku.ca/social-sciences/undergraduate-programs/geography/faculty/david-butz-2/living-with-unexpected-inacces/atta-abad-barrier-lake-drai